Satellite lighting planning

Plan outdoor lighting. See coverage. Request local quotes.

Place fixtures on the property map, aim coverage, adjust daylight visibility, and prepare a clearer lighting quote request.

  • Place fixtures on the map
  • Aim coverage with a heatmap
  • Plan poles, wiring, controls, and brightness
Outdoor area lighting fixtures aimed across an open property work area
Lighting plan focus

Outdoor lighting cost calculator

Your planning estimate updates immediately as you change fixture count, product, heads, pole/base work, trenching, wiring, controls, and local factors. Coverage is still a planning simulation, not a certified photometric plan.

Loading published pricing...

Choose lighting type

Product and fixture count

Dominator wired 150W sport court light sport court lighting product example
Dominator wired 150W sport court lightDominator | Backyard kits19,500 lm, 150W, IP65Public product specs: 19,500 lumens per 150W fixture, 6000-6500K, CRI >80, IP65, UL; public assembly pricing varies by fixture count.

Sport-court linked layout

Pickleball lighting layout1 x 1 court layout | 2 poles, poles on one long side, 5 ft from the court edge.
2poles6heads900Wload

The calculator uses this as a linked sport-court layout. The map estimator will still let you place, move, and aim the actual poles before requesting quotes.

Installation assumptions

Lighting planning estimate

Single midpoint price with the likely planning range below it.

$12,380Range: $9,313 - $18,808
Estimated unit rate$4,657 - $9,404 / each
Materials$5,771
Labor$4,015
Overhead$979
Profit$1,615
Pricing notes
  • Lighting coverage and product output are planning simulations based on available specs. Contractors should verify final photometrics, glare, electrical, code, and permits.
2fixtures / poles6total light heads117,000modeled lumens900Wconnected load
Pickleball lighting layout1 x 1 court layout | 2 poles, poles on one long side, 5 ft from the court edge.
2poles6heads900Wload

The calculator uses this as a linked sport-court layout. The map estimator will still let you place, move, and aim the actual poles before requesting quotes.

Lighting details affecting this estimate
Lighting equipment$5,200Installation labor$2,500Concrete / pole base$2,280Trenching / wiring allowance$1,700Controls / timer allowance$700
0
Use this estimate as a starting point

This estimate is not localized yet. You can still draw it on the map, or add an address first for local context.

Project planning focus

Plan lighting around coverage, glare, and electrical scope

Lighting pages should help property planners show where lights belong, what each fixture is aimed at, how much overlap is expected, and which connected project the lighting serves. The coverage preview is planning-grade and should lead to a contractor review, not replace photometric or electrical design.

Estimate My Lighting
Sport court lighting fixtures shown over a court planning scene
01

Place every fixture

Pole, bollard, flood, accent, and security lights should be visible in the property plan.

02

Aim before pricing

Left/right direction, tilt, mounting height, dimming, and beam assumptions change the coverage conversation.

03

Show connected work

Lighting for a court, driveway, path, gate, or wall should reference that item so the right contractor can quote it.

Lighting styles

Plan lighting around the area it needs to serve

The same property may need court lighting, path lighting, security lighting, and accent lighting. Keep those fixtures organized so contractors understand the intent.

Sport court lighting poles illuminating a marked court surface

Sport court lighting

Pole-mounted fixture planning for pickleball, basketball, tennis, and multi-court areas.

  • $0 - $0 / sq ft
  • Materials: $0 / sq ft
  • Labor: $0 / sq ft
Outdoor flood lights aimed across a broad open property area

Area and flood lighting

Broader visibility for open pads, yards, lots, driveways, and work areas.

  • $0 - $0 / sq ft
  • Materials: $0 / sq ft
  • Labor: $0 / sq ft
Outdoor lights aimed over a concrete pad or work area

Concrete pad lighting

Fixture planning for concrete pads, service areas, equipment yards, and small work zones.

Low outdoor lights along a walkway and entry path

Path and walkway lighting

Lower-height fixture planning for paths, entries, steps, and circulation routes.

  • $0 - $0 / sq ft
  • Materials: $0 / sq ft
  • Labor: $0 / sq ft
Path lights around a concrete entry and walkway

Entry and step lighting

A smaller lighting scope for entries, walkways, steps, and approach areas.

Accent lights highlighting landscaping and outdoor focal points

Landscape and accent lighting

Feature lighting for planting beds, walls, signs, trees, and property focal points.

  • $0 - $0 / sq ft
  • Materials: $0 / sq ft
  • Labor: $0 / sq ft
Security light fixture aimed across a driveway and entry area

Security and driveway lighting

Visibility planning for driveways, gates, parking areas, entries, and utility zones.

  • $0 - $0 / sq ft
  • Materials: $0 / sq ft
  • Labor: $0 / sq ft
Outdoor security lighting over an asphalt driveway or paved area

Asphalt area lighting

Lighting scope for asphalt driveways, paved access, parking pads, and darker surface areas.

Cost drivers

What usually moves a lighting estimate

01

Fixture and pole type

Wattage, lumen output, mounting style, poles, heads, and fixture ratings affect material cost.

02

Electrical access

Panel distance, trenching, conduit, wire size, controls, timers, and switching can become major scope items.

03

Mounting height and footing

Higher poles, concrete footings, brackets, and equipment access change labor.

04

Coverage requirements

Courts and work areas may need more consistent brightness than paths, accent lighting, or driveway security lighting.

05

Glare and spill control

Neighbors, roads, windows, and property lines can require shielding, aiming changes, or different fixtures.

06

Permits and code review

Electrical permitting, utility marking, inspections, and local lighting rules may apply.

Lighting planning workflow

Place lights before asking contractors to quote the layout

Lighting estimates depend on fixture type, pole height, aiming, coverage overlap, trenching, controls, footing work, and whether the lights are serving a sport court, driveway, path, or open area.

  1. 01

    Choose the lighting use

    Start with sport court, flood, path, accent, or security lighting assumptions.

  2. 02

    Place fixtures

    Click the map where poles, bollards, or mounted fixtures should sit.

  3. 03

    Aim the coverage

    Drag aim handles and adjust tilt, height, and fixture direction to preview the coverage intent.

  4. 04

    Request a lighting quote

    Send contractors the fixture list, aiming assumptions, estimated coverage, notes, photos, and linked project context.

Start Planning on the MapYour saved plan stays in this browser until you submit a quote request.

Mistakes to avoid

Lighting mistakes to avoid

Use these reminders before you request quotes, so the first contractor conversation starts with fewer unknowns.

01

Using one fixture for every use

A court, walkway, driveway, and accent feature need different brightness and mounting assumptions.

02

Ignoring power route

A fixture location is incomplete without thinking about trenching, conduit, and panel access.

03

Treating the heatmap as certified photometrics

The heatmap is useful for planning, but contractors still need to verify fixture output, glare, and electrical code.

Property plan

Build a lighting plan around placement, aim, and electrical scope

A useful lighting plan shows fixture locations, aiming direction, mounting height, dimming assumptions, controls, wiring/trenching expectations, and any connected sport court or driveway scope.

Lighting quote prep

A stronger lighting request includes fixture locations, products or planning fixture types, mounting heights, aiming, dimming, heatmap intent, connected project items, power route photos, controls, and glare or neighbor concerns.

The drawing is planning-grade. A contractor, permit office, engineer, surveyor, or utility locator may still need to verify boundaries, utilities, drainage, structural requirements, slope, soil, and field measurements.

Estimate My Lighting
01

Fixture placement

Pole, bollard, wall-mounted, and ground fixtures need different footing, power, and access assumptions.

02

Aim and tilt

Left/right aim and vertical tilt change where light lands and where spill may occur.

03

Power and controls

Trenching, conduit, panel capacity, switches, timers, photocells, and smart controls can change scope.

04

Neighbors and glare

A planning heatmap helps discuss coverage, but final glare, code, and photometric review may still be needed.

See the estimator in action

Start with the map, then refine the lighting scope.

The walkthrough shows the satellite planning workflow. Use it as the starting point, then switch into lighting mode to draw this project on your property.

  • Finds the property on satellite imagery
  • Shows live measurements and cost updates
  • Prepares a quote-ready project summary
Open the Estimator

Start with the property map

Place the lights and preview coverage on the map.

Create a lighting layout, aim each fixture, review the planning range, and request quotes when the coverage intent is clear.