New court build
1 tennis doubles court with selected surface, lines, colors, and equipment.
Tennis court planning
Place a larger tennis footprint on the property map, compare base, surfacing, net, fencing, lighting, and drainage scope, then request quotes with a clearer plan.

Design it on the property map
The estimator uses the placed court, orientation, surface choices, equipment, lighting, and related scopes to build a property plan that is easier to review than a plain form submission.
Your planning estimate updates immediately as you change court type, scope, base, surface, equipment, and court count. Add a location when you want approved local factors included.
Single midpoint price with the likely planning range below it.
Running total for the court, base, fencing, and lighting selections on this page.
1 tennis doubles court with selected surface, lines, colors, and equipment.
7,200 sq ft linked asphalt base priced from the matching calculator row.
Not included. Add it from the venue add-ons when the court needs perimeter fencing.
Not included. Add it from the venue add-ons when the court needs night-use planning.
Base work and acrylic surfacing are shown separately so the estimate is easier to compare.
This estimate is not localized yet. You can still draw it on the map, or add an address first for local context.
Court scope
New construction, resurfacing, striping, equipment, lighting, and fencing are different jobs. The estimator keeps those choices visible so the request is clearer.

Plan the base, pad dimensions, play orientation, access, drainage, net, posts, and acrylic surfacing together.

Compare resurfacing when an existing court or pad needs crack repair, coating, color, and new tennis lines.

Tennis courts often need containment fencing, gates, maintenance access, and enough room around the playing lines.

Add lighting posts, net and posts, sleeves, and related equipment so those items are visible in the request.
Cost drivers
Court pricing is sensitive to the base, surface system, repair level, equipment, and access. These are the main items to decide before requesting contractor input.
large pad footprint and property access
asphalt or concrete base construction
existing surface condition, crack repair, low spots, and drainage
standard acrylic or cushioned acrylic surface system
tennis net and posts, fencing, gates, lighting, and site prep
Quote prep
A stronger tennis court request includes the court footprint, base material, surface system, net and posts, fencing, gates, lighting, drainage notes, access photos, and existing-surface condition.