New court build
1 pickleball court with selected surface, lines, colors, and equipment.
Pickleball court planning
Place the court, rotate it, choose colors and surface scope, add net, lighting, and fencing allowances, then use the mapped plan for a clearer quote request.

Design it on the property map
The estimator uses the placed court, orientation, surface choices, equipment, lighting, and related scopes to build a property plan that is easier to review than a plain form submission.
Your planning estimate updates immediately as you change court type, scope, base, surface, equipment, and court count. Add a location when you want approved local factors included.
Single midpoint price with the likely planning range below it.
Running total for the court, base, fencing, and lighting selections on this page.
1 pickleball court with selected surface, lines, colors, and equipment.
1,800 sq ft linked asphalt base priced from the matching calculator row.
Not included. Add it from the venue add-ons when the court needs perimeter fencing.
Not included. Add it from the venue add-ons when the court needs night-use planning.
Base work and acrylic surfacing are shown separately so the estimate is easier to compare.
This estimate is not localized yet. You can still draw it on the map, or add an address first for local context.
Court scope
New construction, resurfacing, striping, equipment, lighting, and fencing are different jobs. The estimator keeps those choices visible so the request is clearer.

Plan the pad, base material, court orientation, acrylic surfacing, net, posts, and edge clearances together.

Use resurfacing scope for an existing asphalt or concrete pad, including crack repair, color coating, and lines.

Compare a lighter striping-only scope when the surface is already usable and only court lines are needed.

Include court wrap fencing, gates, lights, and equipment when those items are part of the same request.
Cost drivers
Court pricing is sensitive to the base, surface system, repair level, equipment, and access. These are the main items to decide before requesting contractor input.
new asphalt or concrete base versus existing pad resurfacing
court count, clearances, rows, columns, and linked layouts
standard acrylic or cushioned acrylic surface system
crack repair, low spots, drainage, and access for base work
net and posts, color zones, line color, lighting, and generated fencing
Quote prep
A stronger pickleball court request includes court orientation, pad dimensions, base material, surface system, color zones, net and posts, fencing, lighting, drainage notes, and photos of the existing area.